Report: JLENS Airship Not Meeting Expectations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Oct 26, 2015

Report: JLENS Airship Not Meeting Expectations

But Program Has Powerful Friends In Washington

An investigation conducted by a news organization has found that the Army's JLENS program has failed to meet expectations after 17 years and an investment of nearly $3 billion.

The Baltimore Sun reports that, according to an investigation by Tribune Media, the 240-foot-long white tethered blimp has failed to effectively track targets and distinguish threats from friendly aircraft. Tribune Media reports that in a review of reports generated by the U.S. GAO and the Pentagon Operational Test and Evaluation Office, the JLENS' performance was rated as "poor" in 2012, citing issues if four "critical performance areas."

The Baltimore Sun reports that the JLENS, which is designed to track low-flying aircraft, did not detect Douglas Hughes, who flew a gyrocopter through the area monitored by the JLENS and eventually landed on the West Lawn of the U.S. Capitol.

He got through, according to the Army, because software issues kept a second JLENS aircraft of the ground, and data from the aircraft has "not been integrated into the NORAD air defense network," according to Maj. Beth R. Smith.

According to the report, the Army tried to end the program in 2010, but prime contractor Raytheon and other supporters managed to salvage funding for the technology. The system was defended by Marine Corps Gen. James E. "Hoss" Cartwright, who was at the time the vice chairman of the Joint Chiefs of Staff.

Cartwright later joined the Raytheon board, and the paper reports that according to the SEC, he was paid more than $282,000 in cash and stock.

The Army says that JLENS is currently in a "testing and system checkout phase."

(Image from file)

FMI: www.army.mil

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC