Philippines Government Cancels Helicopter Deal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 08, 2010

Philippines Government Cancels Helicopter Deal

Contract Worth $73 Million For Military Helos Dumped Due To Price, Ethical Questions

The Government of the Philippines has cancelled a deal to purchase military helicopters worth $73 million from PZL Swidnik amidst allegations that the bid committee rigged the process. While no actual evidence of collusion between the committee and PLZ Swidnik has been found, the government now says the price is too high.

The Philippine Air Force has been trying since 2007 to upgrade its fleet of attack helicopters which it says it needs to fight terrorists and Muslim separatist insurgencies. Inquirer.net reports that a Philippine defense department bid committee had received no bids for eight helicopters in a series of tenders in 2008 and 2009, and only received the bid from PLZ Swidnik after the parameters had been reduced from eight to seven aircraft with different engine and payload specs.

Philippine President Benigno Aquino halted the process and ordered the investigation in October. He said the rules had been "rigged" to favor the Polish defense contractor. That allegation was not proven during the course of the inquiry, but the panel did conclude that the altered tender was "disadvantageous to the government."

Defense ministry spokesman Eduardo Baltac said that Philippine Defense Secretary Voltaire Gazmin had approved the declaration of a failure of bidding. He has also frozen plans to acquire combat utility helos for the Philippine Navy. Gazmin said the country's efforts to modernize its military equipment was "going to encounter some delays."

FMI: www.dnd.gov.ph

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC