Bombardier Breaks Ground On New CSeries Aircraft Testing Site | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 16, 2009

Bombardier Breaks Ground On New CSeries Aircraft Testing Site

Building Will Be Constructed To LEED Environmental Standard

Bombardier Aerospace Tuesday celebrated the ground breaking for the first CSeries aircraft building in Québec, Canada. Located at Mirabel, 45 minutes north of Montréal, the Complete Integrated Aircraft Systems Test Area (CIASTA) is a testing and systems-proving facility that will house a virtual CSeries test aircraft. The CIASTA will test aircraft systems for reliability and functionality one year before the first prototype aircraft flies.

Attended by Bombardier’s employees, suppliers, partners, customers and the media, the groundbreaking lays the path for the new aircraft’s entry into service in 2013. “It’s a red-letter day for the program and an important day for Bombardier Aerospace,” noted Guy Hachey, President and Chief Operating Officer, Bombardier Aerospace in his remarks to the assembled guests. “Today we begin work on the facilities that will be the site of the first CSeries test aircraft. Eventually we will erect a complex of  buildings here that will total 860,000 square feet – that’s the size of 15 football fields – to produce the CSeries family of aircraft.”

The CIASTA will be constructed as a Leadership in Energy and Environmental Design (LEED) building, the first such building for Bombardier Aerospace in the world. LEED is a third-party certification program and an internationally accepted benchmark for the design, construction and operation of high-performance green buildings. The design and construction of the CIASTA is on track and is expected to be ready for test rig assembly next year. Wieland-Dafco Québec Inc. and Ghafari Associates LLC have been contracted to construct the building.

Bombardier C300 Artist's Concept

“We seek consistency and uniformity when it comes to being greener whether it’s our aircraft or the facilities in which they are tested and built,” said Mr. Hachey. The CIASTA will house, among other things, the CSeries aircraft Integrated Systems Test and Certification Rig (ISTCR) or Iron Bird as it is usually called. This will be the first complete test vehicle enabling earlier product maturity. Flight control systems, avionics, electrical and environmental controls will be tested one year ahead of the actual flight test program. Other test articles will include an Interiors Rig, a Systems Integration Test Stand (SITS), an Engineering Simulator (ESIM) and Flight Controls Integration Lab (FCIL).

The first CSeries aircraft test article - a fuselage test barrel - arrived ahead of schedule at its Saint-Laurent, Québec site from China on August 19, 2009. The test barrel is now being prepared for fatigue testing including pressure cycle testing representative of the life of the aircraft.

Since launching the CSeries family of aircraft at the Farnborough Air Show in July 2008, Bombardier has recorded firm orders for 50 CS100 and CS300 aircraft from Deutsche Lufthansa AG and Lease Corporation International Group.

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC