B-52s To Receive Communications Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jul 07, 2013

B-52s To Receive Communications Upgrade

Will Allow Data Transfer Via Satellite Links

Installation of a communications system upgrade earmarked for the venerable U.S. Air Force B-52 Stratofortress bomber fleet is scheduled to start in July. The Combat Network Communications Technology system will enable aircrews to send and receive information via satellite links, allowing them to change mission plans and retarget weapons while in flight. In addition, pilots will be able to interact better with other aircraft and with ground forces. Currently, mission information must be uploaded to a B-52 before each flight.

Other improvements will include a state-of-the-art computing network with workstations at each crew position and an integrated digital interphone with increased capacity that will allow crew members to talk with each other over headsets equipped with noise-canceling technology.
 
The $76 million CONECT upgrade will be performed by Boeing and covers a low-rate initial production of the first CONECT kits, along with spare parts, maintenance and service at Tinker AFB. Low-rate initial production is the first effort in the production phase of the program. The first eight CONECT kits in lot 1 will establish an initial production base for the system and will permit an orderly increase in the production rate for the CONECT system that is sufficient to lead to full-rate production upon successful completion of operational testing.
 
The contract for lot 2 is projected to be awarded in May 2014, for 10 CONECT kits. Then the full-rate production contract, projected for award in January 2015, will be for 10 CONECT kits. Ultimately, CONECT is expected to be installed on all B-52H in the fleet.
 
The first B-52H to receive a CONECT kit will enter programmed depot maintenance at Tinker AFB in July and is scheduled to depart PDM next April. Each upgrade will take an estimated nine months to complete. A CONECT kit was installed in a modified B-52 at Edwards AFB, CA, and has been field tested for several years, Boeing spokesperson Jennifer Hogan said.
 
The B-52H was delivered to the Air Force in 1961-62. The aircraft have been kept aloft through regular maintenance and periodic upgrades. For example, GPS capabilities were incorporated into their navigation systems in the late 1980s. "We are bringing this amazing workhorse of a bomber into the digital age and giving our customer the infrastructure necessary for continued future improvements," said Scot Oathout, Boeing's B-52 program director.
 
Citing engineering studies, Air Force officials said the heavy bombers could keep flying for at least another quarter-century.

(B-52 image from file.)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC