AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Nov 28, 2018

AD: Airbus SAS Airplanes

AD NUMBER: 2018-23-02

PRODUCT: All Airbus SAS Model A318 and A319 series airplanes; Model A320-211, A320-212, A320-214, A320-216, A320-231, A320-232, and A320-233 airplanes; and Model A321-111, A321-112, A321-131, A321-211, A321-212, A321- 213, A321-231, and A321-232 airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by reports of missing assembly hardware on the trimmable horizontal stabilizer actuator (THSA).

This AD requires repetitive inspections and checks of the lower and upper THSA attachments and applicable related investigative and corrective actions; a one-time inspection of the THSA lower attachment and replacement as applicable; and, for certain airplanes, activation of the electrical load sensing device (ELSD) and concurrent modifications.

DATES: This AD is effective December 28, 2018.

COST: The FAA estimates that this AD affects 1,180 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Inspections, check, activation, and modifications - Up to 59 work-hours × $85 per hour = $5,015 per aircraft. Parts - Up to $15,353. Cost per aircraft - Up to $20,368.
  • Reporting 1 work-hour × $85 per hour = $85 per aircraft.
  • Replacement 11 work-hours × $85 per hour = $935. Parts - $240,000. Cost per aircraft - $240,935.
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC