NASA Conducts 3rd RS-25 Engine Test Ahead of Artemis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sun, Dec 03, 2023

NASA Conducts 3rd RS-25 Engine Test Ahead of Artemis

Aerojet Rocketdyne Continues Work on Rocket for Lunar Return

NASA finished the 3rd of a series of 12 ground tests of the SLS rocket that will one day power Artemis program missions to the moon - and beyond.

The RS-25 engines are swinging for the fences in a change from the norm around NASA, where uncrewed, spacefaring drones became the norm. Manned missions require a lot of thrust, and the aged, handworked Saturn V was simply too difficult to recreate today without retreading significant design ground. The RS-25 will boast the best tech that they can build today, with all kinds of additive manufacturing and computer optimization allowing for futuristic improvements in weight and output (hopefully quality, too but only time will tell.) As installed, 4 engines will generate a combined 1.6 million pounds of thrust at launch, and 2 million during ascent. Artemis missions I through IV will use "modified holdover space shuttle main engines", scavenged by NASA and Aerojet Rocketdyne in a feat of thriftiness.

The 11-minute hot fire occurred on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. This one wasn't a garden variety static test, either, being used to test the engine's gimbaling techniques that will one day prove vital to control and stabilize the SLS as it reaches orbit. As part of the test, operators "also pushed the engine beyond any parameters it might experience during flight to provide a margin of operational safety." In practice, the RS-25s will fire for 500 seconds straight, while the test took one straight to 650 seconds of burn. Even better to stress-test it, the RS-25 was fired up to 113% of regular output, exceeding the "111% needed to lift SLS to orbit."

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC