AD: Fokker Services B.V. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Jan 16, 2018

AD: Fokker Services B.V. Airplanes

AD NUMBER: 2018-01-09

PRODUCT: Certain Fokker Services B.V. Model F28 Mark 0100 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 95-25-02, which applied to the aircraft listed above.

AD 95-25-02 required inspection(s) to detect cracks of the fuselage-mounted half of hinge assemblies of the small cargo door, and replacement of any cracked hinge assembly with a new hinge assembly.

This new AD was prompted by a report that the hinges of the small cargo door are made of a material that is sensitive to stress corrosion and fatigue cracking, and by the determination that the existing inspection program does not provide sufficient protection against fatigue-induced cracks.

This AD requires contacting the FAA to obtain instructions for addressing the unsafe condition on these products, and doing the actions specified in those instructions.

DATES: This AD becomes effective January 29, 2018. Comments on this AD must be received by February 26, 2018.

COST: Currently, there are no affected U.S.-registered airplanes. Should an affected airplane that be placed on the U.S. Register in the future, the FAA estimates the cost of compliance for this AD to be $170 per aircraft per inspection cycle. Repairs are estimated to cost up to $23,510 per aircraft for parts and labor.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC