Boeing Elects To Conduct Inspections On 787s Before Flight Tests Continue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jun 26, 2010

Boeing Elects To Conduct Inspections On 787s Before Flight Tests Continue

"Workmanship Issues" Identified On The Dreamliners' Horizontal Stabilizers

After some very successful initial flight testing, the Dreamliner program has been dealt a bit of a setback, as Boeing recently identified a workmanship issue with the 787's horizontal stabilizers. Some airplanes apparently have issues with improperly installed shims and the torque of associated fasteners, and Boeing says the finding requires inspection of all airplanes and rework if discrepancies are found.

The company says it has already implemented inspection and rework plan for airplanes in production. For those airplanes requiring rework, Boeing says they expect it will take up to eight days for each airplane. the company says it is not unusual for these issues to arise in the course of production programs - they are identified, dispositioned and dealt with through normal processes.

Boeing insists that reports that the fleet is "grounded" are incorrect. The company has made the decision to inspect the horizontal stabilizers on all flight test airplanes before their next flights to ensure any rework is completed as quickly as possible. Inspections are expected to take one to two days.

The Seattle Times reported that the stabilizer issue was first discovered last week. Boeing spokeswoman Yvonne Leach told that paper that the planemaker "made a decision to be prudent and do the inspections" before flying again. The improperly installed shims could have led to a "lower than expected longevity" for the joints in the horizontal stabilizer. The Italian manufacturer Alenia builds the tail assembly for Boeing.

Boeing says it expects that the issue will be addressed within the existing program schedule, and that the 787 remains on track for first delivery to ANA by the end of this year.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC