Boeing Team Rebuilds B-1 'Backbone' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 01, 2009

Boeing Team Rebuilds B-1 'Backbone'

Damaged B-1 Returned To Service

A USAF B-1B bomber returned to flight last week after a Boeing team replaced its catastrophically damaged upper-center boron longeron – the aircraft's "backbone." The B-1, Swift Justice, was damaged during a routine training mission in December 2007. An engine-bleed air duct rupture triggered a temperature warning light, forcing the crew to land the aircraft at Ellsworth Air Force Base, S.D.

Replacing the upper-center boron longeron, which is essential for stability in flight, is not a simple task because the part is unique to each aircraft, with no spares available.

“The boron backbone of the B-1 is an aggressive composite design, even by today’s standards,” said Mahesh Reddy, B-1 program director for Boeing Global Services & Support. “In order to perform the repair, we worked with the Air Force and industry partners to remanufacture the entire part.”

Boeing Integrated Defense Systems and Boeing Commercial Airplanes employees from sites across the company worked together with the Air Force and material vendors to re-create the damaged part. Specialty Materials Inc. in Lowell, Mass., the original boron/epoxy supplier, provided 14,000 feet of 4-inch-wide unidirectional tape to fabricate the longeron. Cytec Engineered Materials Inc., in Tempe, Ariz., supplied the adhesive film and adhesive primer. Due to the part's complexity and 47.5-foot length, the Boeing Composite Fabrication & Assembly Center in Seattle was selected to perform the layup and cure the part in its 90-foot-deep autoclave.

“The return to flight of this B-1 is a perfect example of how Boeing solves issues by applying skills and capabilities from across the company, our suppliers and our customer,” said Reddy.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC