Texas, Florida Senators Present Bipartisan Front On Space Launch System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Sep 10, 2011

Texas, Florida Senators Present Bipartisan Front On Space Launch System

Senators Nelson And Hutchison Again Call For Acceleration Of SLS Development

U.S. Senators Kay Bailey Hutchison (R-TX) (pictured) and Bill Nelson (D-FL) have renewed their call on the White House to move forward with the development of a Space Launch System rated to carry people into low Earth orbit and to the ISS.

Senator Hutchison

“A just-completed, NASA-commissioned independent cost assessment by Booz Allen Hamilton found that development of the Space Launch System, Multi-Purpose Crew Vehicle and complementary ground system was feasible within authorized funding levels and timelines," the Senators said in a joint statement. "This was expected; NASA experts had verified and re-verified estimated costs several times.

"Rather than announce these results and move forward with development, the administration’s budget office has kept the independent cost report under wraps.  Instead, a wildly inflated set of NASA cost numbers was invented, based on an imaginary “acceleration” of SLS development. Under these contrived numbers, which were leaked in yesterday’s Wall Street Journal, development costs were forecast to increase to $57 billion – nearly double the amount that NASA and Booz Allen Hamilton agreed would be needed in the independent cost assessment.

Senator Nelson

"No one has proposed to accelerate development. We and others have – repeatedly – demanded that the administration’s budget office simply follow the development plan that the President signed into law last year. It has been validated repeatedly, internally and externally (including the OMB requested Booz Allen Hamilton report), as a sound approach for going forward and maintaining our leadership in manned space exploration. Accelerated development is a convenient myth. The White House should proceed immediately according to the reasonable, achievable development timetable embedded in federal law, and preserve America’s pre-eminence in space."

FMI: http://hutchison.senate.gov, http://billnelson.senate.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC