Discovery Launch Pushed Into February | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Dec 03, 2010

Discovery Launch Pushed Into February

More Tests And Analysis Needed Before STS-133 Mission

NASA managers have targeted space shuttle Discovery's launch for no earlier than Feb. 3 at 0134 EST. Shuttle managers determined more tests and analysis are needed before proceeding with the launch of the STS-133 mission to the International Space Station.

The Program Requirements Control Board met Thursday and reviewed engineering evaluations associated with cracks on two 21-foot-long, U-shaped aluminum brackets, called stringers, on the shuttle's external tank. NASA repaired the cracks and reapplied foam to the exterior of the stringers. Managers decided the analysis and tests required to launch Discovery safely are not complete. They are planning to conduct an instrumented test on the external fuel tank and structural evaluations on stringer test articles to determine if the analysis is correct. Details and timelines for the tanking test are in work, but plans call for temperature and strain gauge measurements in the intertank region near the top of the tank during the test.

The test also will verify the integrity of repairs made earlier when two cracked stringer sections and foam were replaced. A team of engineers and technicians will inspect the tank for evidence of any foam cracking as it would on an actual launch day. The test also will verify the integrity of repairs to the Ground Umbilical Carrier Plate, which leaked an unsafe amount of gaseous hydrogen during Discovery's Nov. 5 launch attempt. The date of the test is under evaluation, but likely will occur this month.

Engineers will continue to search for the root cause of the stringer cracks through data analysis and tests, including placement of manufacturing defects in separate stringers to demonstrate structural integrity in an effort to duplicate the same type of failure that occurred in November.

NASA will review and analyze the data from the tests before setting a launch date.

Because of Discovery's delayed launch, the earliest opportunity for the liftoff of the final scheduled shuttle mission, STS-134 on Endeavour, is April 1.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC