Broken Crane Forces NASA To Bump Probe Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jun 06, 2007

Broken Crane Forces NASA To Bump Probe Launch

Dawn, Delayed

The long, strange trip NASA's Dawn spacecraft has travelled to reach the stars took another unexpected detour this week, as NASA announced a broken launch pad crane will delay the probe's planned June 30 launch by at least one week.

Florida Today reports NASA halted the countdown for Dawn last week, after a crane at launch pad 17A broke down. The crane is used to hoist the stages of the Delta II launch vehicle (shown above), as well as the spacecraft itself, into position.

Fortunately, the breakdown caused no damage to the launch vehicle, or Dawn itself... but the needed repairs to the crane will mean a liftoff date sometime in early July.  The actual date has not been finalized.

It isn't the first time the Dawn mission has hit a snag. As Aero-News reported, NASA cancelled the mission outright in March 2006 -- after delaying it in January -- citing cost overruns, budgetary woes, and technical faults that plagued the project for years. However, the agency later granted Dawn a reprieve, after receiving several protests from the scientific community.

Once it is eventually launched, Dawn will visit the asteroids Ceres and Vesta, contained in an asteroid belt between Mars and Jupiter. They are two of the largest such bodies in the solar system, and scientists hope the two heavenly bodies will reveal clues about the formation of the solar system.

FMI: http://dawn.jpl.nasa.gov/

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC