Third C-130 AMP Aircraft Flies Ahead Of Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Mar 20, 2009

Third C-130 AMP Aircraft Flies Ahead Of Schedule

Modification Program Adds Glass Capabilities To Stalwart Transports

Boeing disclosed this week it successfully completed the first test flight of the US Air Force's third C-130 Avionics Modernization Program (AMP) aircraft on January 17, three weeks ahead of schedule. The flight marked another milestone for the most comprehensive C-130 avionics modification ever conducted.

The H3 aircraft accomplished both functional check flight and acceptance check flight tests. Boeing test pilot Mike Leone conducted the two-hour flight from the Boeing facility in San Antonio.

"The joint effort between Boeing and our Air Force customer continues to enable the C-130 program to reach critical milestones ahead of schedule and under cost," said Mark Angelo, Boeing C-130 AMP program manager. "We are proud to continue to provide the Air Force with a modern tactical airlift platform."

Boeing completed the major modification and upgrade package on H3 about 13 percent faster than the upgrade to H2.5. H3 will soon join aircraft H2 and H2.5 in the flight test program, which is 81 percent complete.

The Air Force and Boeing signed a contract on Sept. 30 for the first two Low Rate Initial Production (LRIP) AMP kits. Boeing plans to provide a total of 26 kits, engineering services, training and logistics support during LRIP. The company will also install production kits on 11 of the C-130 aircraft.

FMI: www.boeing.com/defense-space/support/maintenance/c130/index.html

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC