U.S. Officials See Major Hurdles To F-22 Export | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Jun 14, 2009

U.S. Officials See Major Hurdles To F-22 Export

Legally, We Can't/Won't Sell Them Overseas

When Defense Secretary Robert Gates decided to end F-22 production after 187 of the advanced fighters are built, Hawaii Senator Daniel Inouye (D), chair of the Senate Appropriations Committee, and other lawmakers began talking about exporting the planes. Originally, 243 F-22's were expected to be built by Lockheed Martin.

According to The Washington Post, U.S. Air Force Chief of Staff General Norton Schwartz told Congress that the military requirement for the F-22 remains at 243, but he said at a Heritage Foundation event on Thursday that 187 would be "sufficient" and "adequate" for the U.S. Air Force to fulfill its mission of securing the skies.

House Appropriations Chairman David Obey (D-WI)authored an amendment in 1998 to ban foreign sales of the F-22 overseas. Schwartz aslo cited numerous technical issues that would make reconfiguring the aircraft for export very expensive. He also questioned whether the production lines would still be open by the time any new export law could be crafted and passed.

Some congressional aides see a potential softening among members on the export issue, considering recent developments in such hotspots of the world like North Korea. Japan is particularly interested in the aircraft. One aide, who asked not to be named by the Post, also said the technical issues could be resolved, since 95 percent of the F-22 components were also used in the F-35 Joint Strike Fighter.

Still, the F-22 production line is already prepping for shutdown, and General Schwartz is not optimistic about continuing the program. "The pragmatic obstacles are very substantial," he said. "The technical, legal and timing aspects of this are very significant."

FMI: http://www.lockheedmartin.com/products/f22/

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC