Bombardier's Next CSeries Airframe, The CS300, Readies For First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Feb 23, 2015

Bombardier's Next CSeries Airframe, The CS300, Readies For First Flight

Transport Canada Issues Flight Permit for First CS300 Flight Test Vehicle -- Targets February 26-28 for First Flight

Bombardier Commercial Aircraft has confirmed that 'following a thorough inspection of the aircraft and a review of all the associated build documentation' Transport Canada inspectors have issued the flight permit that allows the first CS300 flight test vehicle to join the flight test program.

Pending optimal weather conditions, the CS300 aircraft's first flight is expected to occur during the period February 26 - 28, 2015. More precise timing will be confirmed approximately 48 hours prior. The aircraft is expected to perform a series of handling and system calibration tests, at a wide range of altitudes and speeds.

"This is an exciting time. The first four CS100 Flight Test Vehicles (FTVs) have flown more than 1,000 hours, test results are looking great and the CS300 aircraft will perform its maiden flight in the coming days," said Rob Dewar, Vice President, CSeries Program, Bombardier Commercial Aircraft.

"The success of the CSeries aircraft program is testament to the dedication and hard work of our partners, suppliers and in-house teams, and it has also benefitted greatly from the involvement of our customers."

Bombardier has booked orders and commitments for 563 CSeries aircraft, which include firm orders for 243 CSeries airliners.

FMI: www.bombardier.com, www.cseries.com

 


Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC