Phase 2 Capital Improvements Completed At KDWH | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jan 11, 2017

Phase 2 Capital Improvements Completed At KDWH

GA Runway And FBO Terminal At Northwest Houston's David Wayne Hooks Airport Open After Refurbishments

David Wayne Hooks Airport (KDWH),Northwest Houston's principal business and general aviation airport, has completed phase two of its capital improvement program which includes resurfacing the General Aviation (GA) runway and refurbishment of the Gill Aviation FBO Terminal building.

The 3,500 foot GA runway was resurfaced with asphalt and reconfigured to improve better access to the aircraft taxiway while creating a greater buffer of safety. The runway was also remarked and a four-light Precision Approach Path Indicator (PAPI) system is to be installed.
 
The Gill Aviation FBO terminal building was also refurbished as part of phase two improvements. Enhancements included roofing, exterior and interior paint, flooring, lighting and additional tenant and guest parking.

During phase one of the capital improvement program, the primary 7,009 foot runway was resurfaced and remarked and several taxiways were graded and repaved. Other improvements included enlarging and strengthening the main ramp, exterior lighting for T-hangers and installation of high speed security gates.
 
All of the improvements to the airport and FBO have been scheduled for completion prior to the city of Houston hosting professional football's Big Game scheduled for February 5, 2017 at NRG Stadium.

(Image provided with Hooks Airport news release)

FMI: http://www.hooksairport.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC