STS-134 Gets To Wait Another Week For Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, May 02, 2011

STS-134 Gets To Wait Another Week For Launch

Shuttle Endeavour Launch No Earlier Than May 8

While the ANN crew sure enjoyed the few hours we spent last week at the cape in preparation for the launch of STS-134 ... we sure did not enjoy the other ritual we have come to know all too well... the Launch Scrub.

NASA managers have determined space shuttle Endeavour will not launch before Sunday, May 8, but will not officially set a new launch date until early this week. After Friday's launch scrub, Kennedy Space Center technicians searched for the cause of a failure in a heater circuit associated with Endeavour's hydraulic power system. The failure was found to be in a power circuit in a switchbox in the shuttle's aft compartment.

Managers and engineers are developing a schedule to remove and replace the switchbox and retest the new unit. That work will delay Endeavour's launch until at least May 8.

The shuttle has three Auxiliary Power Units (APUs) that provide hydraulic power to steer the vehicle during ascent and entry. The hydrazine fuel lines on each APU have two heater circuits that prevent the fuel from freezing while the shuttle is in space. NASA launch commit criteria and flight rules require all three APUs and heater circuits to be operational for liftoff.

Endeavour's six astronauts have returned to NASA's Johnson Space Center in Houston for several days of additional training -- and in the meantime, the ANN and Aero-TV launch coverage crew looks forward to an actual launch -- someday. 

FMI: www.nasa.gov/shuttle 

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC