New USAF Bomber Slated For 2022 Roll-Out | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, May 28, 2022

New USAF Bomber Slated For 2022 Roll-Out

Northrop-Grumman Reports B-21 Proceeding Apace in Ground-Testing

Northrop Grumman stated that the public unveiling of its next-generation stealth bomber, the B-21 Raider, is still expected later this year.

The aircraft—an advanced, very long-range, heavy-payload, stealthy, intercontinental strategic bomber—is an integral component of the U.S. Air Force’s Long Range Strike Bomber (LRS-B) program. When complete, the B-21 will be able to deliver conventional and/or thermonuclear ordnance to targets anywhere in the world.

Expected to enter service in 2026, the B-21 Raider is to complement existing Rockwell B-1 Lancer, Northrop Grumman B-2 Spirit, and Boeing B-52 fleets already in U.S. service, and eventually replace these bombers.

Currently, six B-21s are in production, with the first aircraft having completed a series of ground-tests at Air Force Plant 42 in Palmdale, California. Subject tests included critical load-calibration assessments which encompassed configuring the aircraft’s instruments and verifying its structural integrity. Subsequent ground-testing comprised powering up the bomber, assessing its subsystems, and applying protective coatings and paint.

Northrop plans to carry out engine runs, and both low and high-speed taxi tests before the B-21 departs on its maiden flight from Palmdale to Edwards Air Force Base, where formal flight testing will commence.

Northrop’s confirmation of a 2023 first flight imparts a degree of certainty to a program thus-far hampered by delays. Original hopes for a December 2021 first flight of the new bomber went unrealized, and both Air Force and Northrop officials have subsequently become more cautious in their statements.

FMI: www.af.mil, www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC