Rolls-Royce Delivers First F-35B Vertical Lift Hardware | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Dec 26, 2008

Rolls-Royce Delivers First F-35B Vertical Lift Hardware

Variable Area Vane Box Nozzle Will Be Integrated By Pratt & Whitney

Rolls-Royce announced Wednesday it has delivered its first production Variable Area Vane Box Nozzle (VAVBN) to Pratt & Whitney for integration on the F-35B Lightning II aircraft. The VAVBN is now ready to be shipped to Joint Strike Fighter (JSF) partner Northrop Grumman for integration into the aircraft.

Northrop Grumman and BAE Systems are the principal industrial partners developing the F-35 with Lockheed Martin Corporation.

The VAVBN is integral to the aircraft structure and is used to control the LiftFan exit airflow when the short take-off vertical landing (STOVL) variant of the aircraft is operated in powered-lift mode. Final assembly was completed at the Rolls-Royce facilities in Indianapolis.

"Today’s delivery represents a significant milestone for the Rolls-Royce LiftSystem program," said Dennis Jarvi, President for Rolls-Royce Defense North America. "The VAVBN provides both thrust vectoring and area-control capability and is an integral part of the aircraft structure. It has undergone over 3500 hours of development testing in the System Development and Demonstration (SDD) program. We are extremely proud that it is ready for production delivery on schedule."

The VAVBN is installed as one of the first items in the aircraft assembly sequence and, once installed, the VAVBN frame is never removed throughout its planned service life of 8,000 flight hours.

The Rolls-Royce LiftSystem consists of the Rolls-Royce LiftFan, the 3 Bearing Swivel Module (3BSM), and the Roll Posts. Rolls-Royce developed the VAVBN as part of the LiftSystem under the F135 System Design and Development contract.

The initial VAVBN production delivery will be under the Low Rate Initial Production (LRIP 2) contract awarded in November 2008 worth $131 Million by Pratt & Whitney for the F135 LRIP2 Program. This VAVBN delivery is the first of six for the STOVL variant F-35B Lightning aircraft.

Delivery of the remaining LiftSystem modules under the LRIP 2 contract will begin in 2009 and continue through 2010.

FMI: www.rolls-royce.com, www.teamjsf.mil

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC