Wed, Oct 28, 2015
Lockheed Martin, NASA Complete Critical Design Review Of The Vehicle
The majority of the Orion spacecraft's Critical Design Review (CDR) has been completed by NASA and prime contractor Lockheed Martin, which means the spacecraft's design is mature enough to move into full-scale fabrication, assembly, integration and test of the vehicle. It also means that the program is on track to complete the spacecraft's development to meet NASA's Exploration Mission-1 (EM-1) performance requirements. The complete Orion EM-1 CDR process will conclude after the European Service Module CDR and a presentation to the NASA Agency Program Management Council in the spring.
Orion's CDR kicked off in August of this year. The review focused on the EM-1 design as well as additional common elements that will be included on the Exploration Mission-2 (EM-2) spacecraft. These elements include the structure, pyrotechnics, Launch Abort System, software, guidance, navigation and control, and many others.
Although the EM-1 vehicle is designed to accommodate all the necessary elements for human exploration of deep space, systems unique to the EM-2 mission, such as crew displays and the Environmental Control and Life Support System, will be evaluated at a later EM-2 CDR.
"The vast majority of Orion's design is over, and now we will only change things when new requirements come into play," said Michael Hawes, Lockheed Martin Orion vice president and program manager. "Considering the incredible complexity of this spacecraft, the team is very proud to have successfully completed the design review and is looking forward to seeing it fly."
In early 2016, Orion's crew module pressure vessel will be shipped to the Operations and Checkout Facility at NASA's Kennedy Space Center. There it will undergo final assembly, integration and testing in order to prepare for EM-1 when Orion is launched atop NASA's Space Launch System (SLS) for the first time. The test flight will send Orion into lunar distant retrograde orbit—a wide orbit around the moon that is farther from Earth than any human-rated spacecraft has ever traveled. The mission will last more than 20 days and will help certify the design and safety of Orion and SLS for human-rated exploration missions.
(Source: Lockheed Martin news release. Images from file)
More News
Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]
Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]
Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]
Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]
"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]