Bombardier Says It's Moving Closer to CSeries Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Nov 13, 2014

Bombardier Says It's Moving Closer to CSeries Certification

FTV1 Is Being Repaired, Other Flight Test Aircraft In Full Operation

In a video released to the media and others, Bombardier says its CSeries flight test program is moving forward towards certification of the airplane.

In the video, Robert Dewar, Bombardier's Vice President for the CSeries CS100 program, says that FTV1, the airplane that had an engine incident, "is being repaired." He said that the repair process is "a good validation of the technology" of the carbon-fiber wing structure. "The repair went very well," he said.

FTV2 has returned to flight, Dewar said, and is "performing exceptionally well."  He said the fly-by-wire technology is performing as expected in the airplane.

FTV4 is also making good progress. This is the airplane that is being used to evaluate aircraft performance. Dewar said that the anti-skid tuning system is being completed in Salina, KS, and the final performance engines have been received. He said that they are working on getting the final performance data for the airplane.

The first interior has been installed on FTV5, Dewar said.

As for the CS300, "it's powered on, painted, engines are installed, and we're getting this aircraft ready to enter the flight test program."

Finally on the ground testing side, "all the structural testing is going well. We're actually on track to finish all the testing this year." Dewar said that the fatigue article has undergone over 7,000 flight cycles.

He said that with the flight test program back underway, the company is now looking forward to entry into service for the new airliner.

(Image from YouTube video)

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC