The Latest From SpaceX: New Launch Window March 20-25 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Feb 26, 2006

The Latest From SpaceX: New Launch Window March 20-25

Static Test-Firing Possible March 17

SpaceX founder Elon Musk tells Aero-News the company has set a tentative launch window for the maiden flight of its Falcon 1 rocket. The window runs from March 20 through 25, with a static test-firing of the rocket's engine likely on March 17. By that time, SpaceX expects issues that popped up during the first static fire-test earlier this month -- which led to the scrubbing of the company's third launch attempt -- will be resolved.

Elon filled us on the latest:

The tentative launch window for the maiden flight of Falcon 1 is March 20 through 25. The gating items are receiving a shipment of liquid oxygen (LOX) from Hawaii and switching out the 2nd stage tank. Obviously, long term operations on Kwaj will require that we install a state-of-the-art, high reliability LOX plant on island. In the meantime, we will get through first launch with LOX shipments from Hawaii and whatever output we can generate from the sad, old clunker of a LOX plant that we currently own.

We are also replacing the 2nd stage tank, following discovery of a small leak. Fortunately, a Falcon 2nd stage tank just barely fits through the door of a standard cargo airplane (no C-17 required), so the flight is relatively inexpensive and readily available. Fixing the leak in the tank being shipped back is not a huge task, but also not something easily done far away from the factory. Countdown procedures have been modified to prevent such leaks from developing in the future.

The static fire performed during the last countdown attempt was really helpful as a preflight systems checkout, so we will be doing one again three or four days before the next countdown (most likely March 17). In addition, we are doing another systems review with DARPA, AF and NASA in early March.

FMI: www.spacex.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC