First 737 MAX Delivery Now Scheduled In Third Quarter 2017 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jun 20, 2013

First 737 MAX Delivery Now Scheduled In Third Quarter 2017

Boeing Accelerates Schedule After 'Retiring Key Technology Risks'

The first delivery of the 737 MAX 8 to launch customer Southwest Airlines will be a quarter earlier than originally scheduled – in the third quarter of 2017 instead of fourth quarter.

"Through our disciplined development on the 737 MAX program, the team has retired key technology risks," said Scott Fancher, vice president and general manager, Airplane Development, Boeing Commercial Airplanes, during a briefing Wednesday at the 2013 Paris Air Show. "We have informed our customers and they are pleased they will be able to put these more fuel-efficient airplanes in their fleets sooner than planned."

Since launch in August 2011, the 737 MAX team has worked to define the final configuration of the airplane including new LEAP-1B engines from CFM International, a redesigned tail cone and the Advanced Technology winglet. Testing in the wind tunnel and data analysis prove that the 737 MAX configuration, set to be final in July, will give customers a 13 percent fuel-burn improvement over today's most fuel efficient single-aisle airplanes.

The work done by Boeing has enabled the program to accelerate the 737 MAX schedule. "We continue to follow our knowledge points through the development process and we have an executable plan. Testing, improvement workshops, and solid early data have allowed us to validate the airplane's performance and move the schedule forward," said Fancher.

Next, after firm configuration is achieved, the 737 MAX team will begin detailed design of the airplane, scheduled for completion in 2014.

(Artist's renderings provided by Boeing)

FMI: www.boeing.com


Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC