AD: Bombardier, Inc. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Aug 24, 2016

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2016-16-15

PRODUCT: certain Bombardier, Inc. Model DHC-8-400, -401, and -402 airplanes.

ACTION: Final Rule

SUMMARY: This AD was prompted by reports of chafing damage due to insufficient clearance on the main landing gear (MLG) stabilizer brace, the nacelle A-frame structure, and the adjacent electrical wiring harnesses.

An insufficient fillet radius may also exist on certain airplanes. This AD requires, depending on airplane configuration, an inspection of the nacelle A-frame structure for insufficient fillet radius; an inspection for cracking of affected structure, and rework or repair if necessary, and rework of the nacelle A-frame structure; repetitive inspections of the nacelle A-frame structure and the MLG stabilizer brace for insufficient clearance and damage, and repair if necessary, and rework of the nacelle A-frame structure, which would terminate the repetitive inspections; installation of new stop brackets and a shim on each MLG stabilizer brace assembly; and rework of the electrical wiring harnesses in the nacelle area.

The FAA is issuing this AD to detect and correct chafing damage and subsequent premature cracking and fracture of the nacelle Aframe structure, which could result in failure of the MLG stabilizer brace and loss of the MLG downlock indication, which could adversely affect the safe landing of the airplane.

DATES: This AD is effective September 23, 2016.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC