Official DOD Statement on Lockheed Martin Win of VXX Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jan 28, 2005

Official DOD Statement on Lockheed Martin Win of VXX Contract

Statement: Lockheed Martin to Build New Presidential Helicopter

The Department of Defense announced today that the team led by Lockheed Martin Systems Integration, Owego, N.Y., has been selected to build the new presidential helicopter (VXX) based on its U.S. 101 medium lift helicopter.

This $1.7 billion, cost plus award fee contract will launch the VXX program’s system development and demonstration phase during which the program will integrate a “system of systems” with a modern, in-production aircraft to provide the president with safe and reliable helicopter transportation.
 
“Today’s announcement is a significant milestone that caps an exhaustive and deliberative source selection process that carefully followed the Federal Acquisition Regulations,” said John Young, assistant secretary of the Navy for research, development and acquisition. “The determined effort, long hours and hard work by both the VXX government team and the two industry teams will ensure a high level of quality and safety for future presidents, as well as a timely, efficient and effective program execution.”

“This decision truly reflects the best value and capability for the American taxpayer who is funding it, the Marines who will operate it and the future presidents who will fly in it,” Young added.

The fleet of helicopters that currently supports the presidential mission includes 30-year old aircraft that were designed in the 1960’s, fielded in the 1970’s and no longer has the growth capability to incorporate the equipment necessary to provide suitable presidential support in the post 9-11 environment.

“Under this replacement program, with its technology and performance improvements, a single platform will provide better savings in total ownership costs, engineering, maintenance and logistical support over the lifetime of the program,” Young said. “The president needs a more survivable helicopter while the nation engages in the Global War on Terrorism, and we are committed to providing it as soon as possible.”

The original Presidential Helicopter Replacement Program of record proposed an initial operating capability in 2013. The VXX program was accelerated in 2003 with a currently planned IOC in fiscal year 2009.

FMI: www.defenselink.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC