FAA Proposes $4.855 Million Civil Penalty Against Evergreen Airlines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Sep 26, 2010

FAA Proposes $4.855 Million Civil Penalty Against Evergreen Airlines

Cited For Violations Of FAA Training Regulations

The FAA has proposed a $4,855,000 civil penalty against Evergreen International Airlines of McMinnville, OR, for allegedly using pilots who had not been trained in accordance with an FAA-approved training program on 232 revenue flights.

The flights were made between February 19 and July 9, 2009, on aircraft equipped with a new flight management system (FMS) that was different enough from the prior system that it required a specific training program for pilots who were flying the aircraft. The FAA alleges Evergreen did not complete its FAA-approved training for pilots before assigning them to fly revenue trips using the new FMS. "We put rules and regulations in place to keep air transportation safe and we expect airlines to comply," said U.S. Transportation Secretary Ray LaHood.

The FAA alleges Evergreen line pilots received ground training and a check ride on the new FMS, but that the company did not provide required familiarization flights supervised by the company's check pilots despite being told to do so by the FAA. The familiarization flights are part of the FAA-approved training program for Evergreen aircraft equipped with the FMS. Evergreen also failed to distribute copies of the required system manual to crews who would be using the FMS.

Subsequent to these improperly conducted flights, Evergreen has ensured that its pilots are trained in accordance with its FAA-approved training program and continues to operate under an FAA-approved training program.

"Even though Evergreen now complies with its training program, this penalty is appropriate because requiring operators to complete required, approved training is the only way to make sure crews are fully qualified to operate the equipment and systems to manage flights safely," said FAA Administrator Randy Babbitt.

Evergreen has 30 days from the receipt of the FAA's civil penalty letter to respond to the agency.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC