Soyuz Is In The Launch Zone For Its December 17 Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 16, 2015

Soyuz Is In The Launch Zone For Its December 17 Mission

Will Launch Galileo Navigation Satellites From French Guiana

Arianespace’s medium-lift Soyuz has moved to the launch pad in French Guiana – and is now ready for integration of its two Galileo satellite passengers at the workhorse vehicle’s dedicated Spaceport complex.

With the rollout and vertical positioning of the basic three-stage vehicle, Arianespace’s Soyuz marked a key step toward its December 17 mission that will deploy the latest two FOC (Full Operational Capability) satellites for Europe’s Galileo space-based navigation system.

The Soyuz for Arianespace’s Flight VS13 is shown after being suspended over the launch pad by four support arms. At left is the 53-meter-tall mobile gantry, which is moving in to protect Soyuz during the upcoming integration of its “upper composite.”

Soyuz was moved via a transport/erector rail car in a horizontal-transfer process from the MIK launcher assembly facility to the Soyuz ELS launch complex – located at the Spaceport’s northwestern sector within the commune of Sinnamary. Once on the launch pad, Soyuz was erected to the vertical orientation, where it was suspended in place by four large support arms, followed by the transport/erector rail car’s withdrawal.

With this step complete, the mobile gantry was moved into position around the launcher, providing protection for the subsequent installation of Soyuz’ “upper composite” – composed of the two Galileo spacecraft and their dispenser system, the Fregat upper stage and payload fairing.

The December 17 launch – designed VS13 in Arianespace’s numbering system – is scheduled to lift off at precisely 8:51:56 a.m. local time in French Guiana, with its Galileo satellite passengers to be deployed during a flight lasting approximately 3 hrs., 47 min.

Flight VS13’s passengers were built by OHB System, and their navigation payloads were supplied by Surrey Satellite Technology Ltd.

The European Commission is managing and funding Galileo’s FOC phase – during which the network’s complete operational and ground infrastructure is being deployed. The European Space Agency has been delegated as the design and procurement agent on the Commission’s behalf.

(Image provided with Arianespace news release)

FMI: www.arianspace.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC