DOT IG To Conduct Another Audit Of ADS-B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 10, 2014

DOT IG To Conduct Another Audit Of ADS-B

Will Focus On FAA's Ability To Monitor Contractors And Payment Procedures

The DOT Inspector General (IG) will conduct another audit of the FAA's progress on the implementation of ADS-B beginning later this month.

A memo dated October 7 from Matthew E. Hampton, Assistant Inspector General for Aviation Audits to "Director of Audit and Evaluation" states that this new audit follows a 2010 report which indicated that the FAA "faces significant risks in implementing the ADS-B program and realizing benefits due to weaknesses in its contract management and oversight."

The initial audit found that the ADS-B contract structure bundles and comingles tasks and costs, making it difficult for decision-makers to manage the contract and track costs. In addition, the IG recently reported changes to the program cost, including the addition of $162 million for performance incentives for the prime contractor through 2025.

The IG is initiating this audit to determine whether the ADS-B contract provides FAA the ability to monitor whether the contractor is providing required ADS-B products and services and evaluate FAA’s procedures for determining payments to the contractor.

The audit will be performed at FAA Headquarters, the ADS-B prime contractor facility, and "other relevant sites."

(FAA Graphic)

FMI: www.oig.dot.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC