Third G250 Test Aircraft Nearly Ready To Fly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Tue, May 04, 2010

Third G250 Test Aircraft Nearly Ready To Fly

Stall Testing And Other Program Activities Proceeding "Well"

Gulfstream said Monday at EBACE that the wing, empennage and engines have been installed on the third Gulfstream G250 test aircraft, and testing of the aircraft's systems is under way. Known as serial number (S/N) 2003, the aircraft will be used to test systems functionality and reliability.


G250 Rollout File Photo

The G250 flight-test and certification program consists of three aircraft and an estimated 1,300 hours of flight time. The first G250 test aircraft, S/N 2001, joined the flight-test program on Dec. 11, 2009, and is being used to examine in-flight performance and handling. S/N 2002, which focuses on avionics testing, first flew on March 24. Together, the two aircraft have accumulated nearly 80 hours in flight, with S/N 2001 already achieving the maximum certified speed and altitude of Mach 0.85 and 45,000 feet (13,716 m).


G250 S/N 2002

"The G250 handles like a large-cabin Gulfstream aircraft," said John O'Meara, chief test pilot. "It's a good-handling airplane. We completed the aerodynamic stall test program, and the resultant performance was even better than we predicted. It's very similar to a Gulfstream V in terms of its handling characteristics."

Other aspects of the G250's test program are also progressing as planned. Several structural tests have been completed, including flap ultimate load, ultimate horizontal stabilizer down bending, ultimate fuselage up bending and wing down bending. Additionally, the fuselage has been joined for the fatigue test article.


G250 First Flight File Photo

Additional tests have been completed in the aircraft's Integration Test Facility (ITF). The G250 is the first mid-size Gulfstream with its own ITF. Based in Savannah, the facility has been used to integrate the software and hardware for the jet's state-of-the-art PlaneView 250 avionics platform and to develop the procedures for the Airplane Flight Manual (AFM). Gulfstream also used the ITF for the aircraft's human factors evaluation by the Civil Aviation Authority of Israel (CAAI), the FAA and the EASA. That evaluation is now complete.

The first G250 rolled out of the IAI manufacturing facility in Tel Aviv under its own power on Oct. 6, 2009. It remains on schedule for type certification by 2011, followed by entry-into-service the same year.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC