F-35 Testing Aircraft Comes Full Circle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Aug 13, 2012

F-35 Testing Aircraft Comes Full Circle

Aircraft Used In Static Test Program Returned To LMC In Fort Worth

After successfully completing the static test program on the F-35 (known as AG-1) BAE systems says it has returned the aircraft back to Lockheed Martin. BAE says the static test program broke all records for the speed of testing, having applied more than 150 different loading configurations in just over nine months. Now, after proving the strength of the aircraft, it is beginning the 4500 mile journey back to the U.S. after almost three and a half years in the structural test facility at Brough in the UK.

Static testing the F-35 means that the aircraft has been ‘flown’ to its limits with loads applied to it replicating the effect of high gravitational forces far beyond any conditions likely to be flown in actual flight.  This is done with the airframe nesting in a multi-million pound rig fitted with over 4000 strain gauges, 170 actuators and over 50 miles of wiring at our Brough site in Yorkshire. Brough is home to a facility well known for putting aircraft through their paces to ensure they are strong enough and resilient enough to perform in the harshest environments in the world.
 
“We certainly don’t give the aircraft an easy ride here," said Tim Bramhall, F-35 structural test program manager at Brough. "We push it to its limits so that we can be confident that each of the 3000+ aircraft that have been ordered will perform safely and effectively. The real challenge is keeping aircraft weight at a minimum while maintaining the strength of the plane within certain specified limits”   
 
“We still have another F-35 CTOL airframe in the facility undergoing fatigue testing along with the remaining "horizontal and vertical tails from the Carrier variant," Bramhall continued. Work on those continues on schedule and are shining examples of the long term future the structural test facility has ahead.”

FMI: www.baesystems.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC