Teams Continue To Work Toward Nov. 30 Discovery Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Nov 15, 2010

Teams Continue To Work Toward Nov. 30 Discovery Launch

GUPC Alignment Tweaked, Fuel Tank Foam Repairs Proceeding

Space Shuttle Discovery continues to wait at launch complex 39A at the Kennedy Space Center in Cape Canaveral, FL, as technicians work to prepare her for her final mission into space.


NASA File Photo

Over the weekend, additional measurements were taken to ensure the best possible alignment of the newly installed ground umbilical carrier plate, or GUCP, on space shuttle Discovery's external fuel tank. Teams installed the flight seal Friday night and will meet today to evaluate data. Technicians expect to begin installing the quick disconnects today (Monday).

Engineers also are continuing work to repair cracks in Discovery's external tank intertank section. During foam removal and inspection of adjacent stringers to the one with two 9-inch cracks, technicians identified a crack about 3-inches long on the left-hand adjacent stringer. This was not an unexpected result since the load was most likely transferred to the adjacent stringer when both sides of the original stringer cracked during tanking operations for Discovery's scrubbed launch attempt on Nov. 5. Teams will build and use existing structural math models to understand the loading at the interface. Stringers are aluminum support strips on the outside of the external tank that form the section between the inside liquid oxygen tank and the liquid hydrogen tanks.

Discovery's launch was delayed when the leaking GUPC was discovered. The cracks in the foam insulation on the main fuel tank were found during the GUPC inspection. The shuttle is now targeted for launch on a mission to ISS on November 30. It will be Discovery's final space flight.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC