Navy Awards Contract For E-2D Advanced Hawkeye Full-Rate Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Aug 13, 2013

Navy Awards Contract For E-2D Advanced Hawkeye Full-Rate Production

Five Of The Aircraft Estimated To Cost $617 Million

The U.S. Navy has awarded Northrop Grumman Corporation a $617 million contract for five full-rate production Lot 1 E-2D Advanced Hawkeye aircraft.

"Moving from low-rate production into full-rate production is a significant milestone for the E-2D Advanced Hawkeye program," said Bart LaGrone, vice president, E-2/C-2 programs, Northrop Grumman Aerospace Systems. "We look forward to manufacturing and delivering a mature and effective airborne early warning, battle management, command and control system."

"Attaining E-2D full-rate production is the culmination of years of hard work," said Capt. John S. Lemmon, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231). "The E-2D team continues to work together with one vision and goal – deliver a solid product to the fleet."

On Aug. 3, 2007, the first E-2D Advanced Hawkeye took to the skies over St. Augustine, FL. Since then, Northrop Grumman has delivered 10 new production E-2Ds to the U.S. Navy, on cost and on schedule. An additional 10 aircraft are in various stages of manufacturing and predelivery flight testing at the company's St. Augustine Aircraft Integration Center. Initial operational capability with the Navy remains on track for 2015.

The E-2D program continues to find ways to reduce costs and provide best value to the customer through improving aircraft delivery processes, standardizing repair methods and looking for opportunities to improve spares timing to increase the overall program affordability.

"We've got the right people and processes in place to make a seamless transition into full-rate production," LaGrone said. "With the Navy's E-2D program of record at 75 aircraft, full-rate production enables the production of the remaining 55 aircraft over the next 10 years and provides the opportunity for a cost-effective, multiyear procurement."

(Image provided by Northrop Grumman Corp)

FMI: www.northropgrumman.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC