Australian Defense Minister Slams Boeing Over Wedgetail Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 30, 2006

Australian Defense Minister Slams Boeing Over Wedgetail Project

"Very Disappointed" With Delays

Australia's defense minister says he's tired of waiting for Boeing to deliver the six Airborne Early Warning and Control Aircraft the manufacturer is building for that country's military.

Bloomberg reports in a joint press conference with US Defense Secretary Donald Rumsfeld this week, Brendan Nelson said his country is "very disappointed" with significant delays in the program.

"I think Boeing has let the Australian government down, and I think they've let themselves down," Nelson said.

Nelson also said he's met with the head of Boeing's defense department, Jim Albaugh... and, he says, he gave Albaugh a message: Nelson intends to make "damn sure" Boeing delivers on their end of the bargain.

Despite his harsh words, however, Nelson was careful to note that he, and other Australian defense officials, are "confident" that despite the 18-month delay, they'll eventually get the aircraft coming to them.

The planes in question are part of the "Wedgetail" program, which uses Boeing's next-generation 737 commercial plane as the foundation for an early-warning radar platform. Boeing is also building a version of the plane for Turkey -- it's called the "Peace Eagle" there -- and that program has suffered from similar delays.

Boeing announced Thursday that it will take somewhere between a $300 million and $500 million pre-tax hit this fiscal quarter for the delays... revenue that Boeing's defense side -- currently a loss leader, compared to Boeing's profitable commercial operation -- really can't afford to lose.

FMI: www.boeing.com/defense-space/infoelect/wedgetail-737/

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC