General Atomics Completes Design Reviews For Aircraft Launcher | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jan 17, 2008

General Atomics Completes Design Reviews For Aircraft Launcher

Electromagnetic Catapult System Bound For NextGen Carriers

General Atomics tells ANN the company celebrated a milestone November 16, 2007 with the successful completion of the final critical design review (CDR) for the Electromagnetic Aircraft Launch System (EMALS). Capt. Stephen Rorke, Naval Air Systems Command (NAVAIR) Aircraft Launch & Recovery Equipment program manager, thought the review "was a rousing success" and praised the team for their "dedicated efforts to complete preparations for this review."

EMALS prime contractor, General Atomics, began manufacturing EMALS linear motor components in its Tupelo, MS facility earlier this year, and will be manufacturing additional subsystems over the next year. GA has recently completed construction of a 5,000 square foot high cycle test facility for EMALS launch equipment and is planning to double the size of its existing fabrication facility to support this and other projects.

Staff is also expected to double by 2009 from the current 30 employees.

"This is good news on two counts," says Senator Roger Wicker (R-MS). "From a national defense perspective, it affirms that EMALS will be a key component in helping make our next-generation aircraft carriers more efficient and effective in projecting U.S. military power. It is good news for Mississippi because it strengthens our partnership with General Atomics. This high-tech production is providing jobs in Tupelo with the potential for even more growth in the months ahead. I look forward to working with General Atomics and the Navy in advancing this important work."

EMALS, a new electromagnetic aircraft launch system for the next-generation aircraft carrier, the Gerald R. Ford class (CVN-78), will replace the current generation of steam catapults. This switch to an electromagnetic system will lower operating costs, require fewer people to operate, improve catapult performance and expand the range of manned and unmanned aircraft that the aircraft carrier can launch.

The next step in the process is to begin installing the full size, ship representative EMALS equipment in the recently completed EMALS test facilities at Naval Aviation Engineering Station Lakehurst, NJ. The EMALS equipment installation is scheduled to begin in mid 2008, with actual testing to begin in early 2009. Testing will continue throughout 2009.

The first components of the EMALS equipment are scheduled to be delivered in 2011 for installation in the CVN-78. The Gerald R. Ford is scheduled to be delivered to the US Navy in 2015.

FMI: www.ga.com, www.navair.navy.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC