Discovery Set To Fly, Despite Lingering Safety Concerns | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 23, 2007

Discovery Set To Fly, Despite Lingering Safety Concerns

Weather Also Poses Potential Conflict

The countdown to the scheduled Tuesday morning launch of space shuttle Discovery on the STS-120 mission is proceeding on schedule, NASA Test Director Steve Payne told reporters Monday. But that doesn't mean all's clear for the shuttle flight.

"At this point in the count, we're on schedule, our systems are all good and we're in great shape," Payne said, adding that the launch team is not tracking any technical issues. However, the weather forecast for Tuesday continues to pose a threat to NASA's launch plans.

Shuttle Weather Officer Kathy Winters reported the seabreeze could begin developing by the 1138 EDT launch time. There is a 60-percent chance that cumulus clouds, showers and a low cloud ceiling could keep Discovery grounded for Tuesday; earlier scheduled launch times for Wednesday and Thursday improve the orbiter's odds of liftoff.

Despite receiving the all-clear to launch last week by NASA mission officials, there are those at the agency who would have preferred to see Discovery stay on the pad, the Palm Beach Post reports, until three worn heat tiles are repaired or replaced.

As ANN reported, three of the 44 reinforced carbon carbon (RCC) tiles that line the edges of Discovery's wings show signs of degradation in their outer coating. Roughly half of the engineers on NASA's shuttle safety team recommended the agency pull Discovery back to the Vehicle Assembly Building, to replace the tiles... adding several weeks to an already tight launch schedule.

Damage to the RCC tiles, caused by a falling chunk of insulating foam from the orbiter's external fuel tank, brought down Columbia in 2003.

After studying the problem, program manager Wayne Hale said last week the agency ruled the issue posed "an acceptable risk," saying the issue has cropped up on past shuttle flights, without leading to catastrophic failure of the shuttle's heat shield.

"There was a great deal of evidence presented, and the preponderance of evidence in my mind says that we have an acceptable risk to go fly," Hale said in an October 16 mission briefing. "And let me make sure you understand that. I didn't say it's safe to go fly and I wouldn't say that. We have an acceptable risk to go fly."

NASA is under the gun to complete the International Space Station, before the shuttle fleet is retired in 2010.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC