NASA Continues Orion Parachute Testing For Future Test Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Apr 19, 2012

NASA Continues Orion Parachute Testing For Future Test Flight

Agency Targets 2014 For First Orion Test Flight

NASA successfully conducted a drop test of the Orion crew vehicle's entry, descent and landing parachutes high above the Arizona desert Tuesday in preparation for the vehicle's orbital flight test, Exploration Flight Test -1, in 2014.

A C-130 plane dropped a dart-shaped test vehicle with a simulated Orion parachute compartment from an altitude of 25,000 feet above the U.S. Army's Yuma Proving Grounds. Orion's drogue chutes were deployed at 20,000 feet, followed by the pilot parachutes, which then deployed the main landing parachutes. The test vehicle landed on the desert floor at a speed of almost 25 feet per second, well below the maximum designed touchdown speed of the spacecraft.

This particular drop test had two primary objectives. The first determined how the entire system would respond if one of the three main parachutes inflated too quickly, which occurs if a reefing stage, which helps the parachutes open gradually, is skipped. The second objective was to validate the drogue parachute design by testing at a high dynamic pressure that closely mimicked the environments expected for Exploration Flight Test-1. This test flight, scheduled for 2014, is designed to test a number of Orion's systems, including the avionics, navigation and thermal protection systems and will send Orion more than 3,000 miles into space.

Since 2007, the Orion program has conducted a vigorous parachute air and ground test program and provided the chutes for NASA's successful pad abort test in 2010. The tests improve understanding about the chutes' technical performance for eventual human-rated certification. The next parachute test will be conducted this summer. (Image provided by NASA)

FMI: www.nasa.gov/orion

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC