Discovery Engines Removed Due To Turbopump Problem | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 24, 2010

Discovery Engines Removed Due To Turbopump Problem

Engineers Say It Should Not Create A Delay For STS-133

Space shuttle Discovery will have its three main engines removed after a low-pressure oxidizer turbopump on engine 1 had an issue during a torque check. All three engines have to be removed to allow access to remove the center engine. The pump will be sent to Canoga Park, CA, for repair.

Engineers considered several alternatives, including whether to wait for the engine and its new turbopump or to install another engine in Discovery that was slated for use on Endeavour. The engine work is not a hindrance to processing and is not expected to prompt a delay for the launch of the STS-133 mission. Removal of the three main engines is planned for Thursday, and it was determined that the turbopump should be replaced and the engines will be reinstalled.

Meanwhile, technicians completed Discovery's payload premate test Wednesday. The drag chute door installation and checkout was completed Tuesday night.  The astronauts continue their training at NASA's Johnson Space Center in Houston for the STS-133 mission, with the crew members are working on robotics tasks they will use during the flight to the International Space Station. They are also undergoing refresher training on International Space Station systems.

FMI: www.nasa.gov

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC