AWACS Techs Get Paperless Link | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jul 15, 2003

AWACS Techs Get Paperless Link

The E-3 Sentry Airborne Warning and Control System became the first weapon system to provide technicians with a paperless link between an aircraft parts manual and the base supply system.

Technicians from the 552nd Equipment Maintenance Squadron have been participating in a test program for a parts ordering tool that provides an electronic link between AWACS parts manuals and the supply system. The ordering tool allows technicians to order parts in a totally paperless environment. The system eliminates the need to search for the part in a paper manual and type in all the information, which saves time and reduces errors.

“We did in 10 minutes what used to take hours,” said Tech. Sgt. Thomas Martin, 552nd EMS dock chief, in reference to a recent maintenance inspection. Basically, the tool allows the technician to electronically search for parts, click on the items to be ordered, review and query the required parts list and submit the request through the automated system.

This technology can eventually be applied to wireless local area network devices, such as rugged laptops, for maintenance. The new tool is expected to save at least 160 man-hours and 25 incorrect parts orders per day when fully implemented throughout the 552nd Air Control Wing here, officials said.

Although the system is not yet fully operational, users have noticed a significant reduction in time spent and are excited about the system’s capabilities, they said.

“Out of several projects I’m involved with, I see the need and benefit of (the ordering tool) to the Air Force in the long term,” said Master Sgt. Rick Celusta, the 552nd Maintenance Operations Flight superintendent. [Courtesy of Air Combat Command News Service]

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC