Boeing Moves 787 Static Test Airframe To Testing Rig | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Apr 26, 2008

Boeing Moves 787 Static Test Airframe To Testing Rig

Stress Testing To Start This Summer On Dreamliner

It was a small trip, but also a major leap. On Friday, Boeing moved the 787 Dreamliner static test airframe from its Final Assembly facility in Everett, WA to its structural test rig, located only 1,000 feet away from Final Assembly at the Everett factory.

While some assembly remains to be completed on the static airframe, Friday's move represents the imminent start of static testing of the first composite-bodied airliner. Test set up is expected to begin immediately, with tests commencing this summer.

"During static tests we apply loads to the airplane structure that simulate both normal operation as well as extreme flight conditions," said Randy Harley, vice president of Engineering & Technology for the 787 program. "We monitor the airplane to confirm analytical predictions and make sure the structure holds up to these conditions."

Boeing also notes movement of the static airframe clears the way to begin assembly of the third 787 to enter the flight test program. Most pieces of the third airplane arrived in Everett earlier this month.

All assemblies for Airplane #3 are now in Everett, and the airplane will be loaded into the first position of Final Assembly early next week.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC