NASA's Johnson Space Center Closes As Ike Looms Off Coast | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 12, 2008

NASA's Johnson Space Center Closes As Ike Looms Off Coast

Mission Control Moved Inland, Progress Docking At ISS Delayed

NASA's Johnson Space Center in Houston, TX closed at noon CDT Thursday, and will remain closed until the threat of Hurricane Ike has passed. Ike, a Category 2 hurricane in the western Gulf of Mexico, is expected to cross the Texas coast early Saturday as a Category 3 storm.

The International Space Station Flight Control Room at Mission Control in Houston was shut down Thursday morning. Station flight control continued through backup teams located near Austin, TX and Huntsville, AL.

"We will assess any damage, and decide when it's safe to come back," NASA spokesman Kelly Humphries told The Houston Chronicle.

Approximately 16,500 JSC workers -- many of whom live in the Galveston Bay area, which is expected to take the brunt of Ike's arrival -- were encouraged to evacuate the area Thursday.

Most NASA aircraft at Ellington Field, located just north of Johnson, have been flown to a facility in El Paso, TX. That includes 19 of 26 T-38s, a WB-57, and three of four shuttle training aircraft. Nine other aircraft are undergoing maintenance, and have been secured in hangars at Ellington to wait out the storm.

The impending storm also delayed the planned Friday docking of a Russian Progress cargo ship at the ISS. That docking, originally scheduled for just after 4:00 pm CDT Friday, will be rescheduled once Mission Control at Johnson is back up and running.

FMI: www.jsc.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC