Red Tails Performing Maintenance On P-51 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jan 10, 2015

Red Tails Performing Maintenance On P-51

Some Major Items Discovered To Be In Need Of Repair

The CAF Redtail Squadron got some bad news when its P-51C Mustang Tuskegee Airmen went in for some routine maintenance. The squadron reports on its blog that the airplane is in need of some major work that will ground the airplane until is it repaired.

According to the blog, the  radiator, one of the legs of the landing gear, a piston ring and damage to the aileron cables are all on the docket for repair, along with the Mustang’s regularly-schedule maintenance. Although none of these needs indicate a life-threatening problem to the aircraft, they certainly are very expensive and need to be attended to before it can be flown again.

Tye Halvas and the team at AirCorps Aviation are giving us the inside scoop on the maintenance and repair, and we are going to keep you updated with regular posts and pictures to follow along with the process. Keep your eyes on this blog for updates!

Current work in progress:

Engine – The banks and pistons are at Roush Aviation and will be done the first week of February. Right now they are in the disassembly and inspection process.

Landing gear – The pivot shafts are getting magnafluxed and cadmium plated. They are expected back January 13th. At that point that landing gear will be reassembled, serviced with fluid and nitrogen and installed in the aircraft.

Horizontal stabilizer – The patch has been completed and the paint process is done though primer. As soon as the landing gear is in and the aircraft is back on the ground it will be painted red.

Radiator – The radiator has been cleaned and inspected. Repairs have been made to the solder and the core is currently being tested.

The squadron said it will continue to post updates on the progress of the repairs as they are made.

(Image provided by the CAF. Mechanic Brian Bottolene works to hoist the right bank off of the engine)

FMI: www.redtail.org

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC