AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jun 12, 2019

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2019-08-04

PRODUCT: Certain Bombardier, Inc., Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2012-25-02, which applied to the product listed above.

AD 2012- 25-02 required revising the airworthiness limitations section (AWL) of the instructions for continued airworthiness (ICA) of the maintenance requirements manual (MRM) by incorporating new procedures for repetitive inspections for cracking of the rear pressure bulkhead (RPB).

AD 2012-25- 02 also required revising the maintenance or inspection program to incorporate a revised task. This AD also mandates modification of the RPB and adds repetitive inspections for cracking of the RPB web, which terminates certain actions in this AD.

This AD was prompted by additional in-service crack findings, which resulted in the development of a structural modification to the RPB.

DATES: This AD is effective July 12, 2019.

COST: The FAA estimates that this AD affects 457 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The FAA has determined that revising the maintenance or inspection program takes an average of 90 work-hours per operator, although this number may vary from operator to operator.

In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), a per-operator estimate is more accurate than a per-airplane estimate. Therefore, the estimated total cost per operator is $7,650 (90 work-hours x $85 per work-hour).

The FAA has received no definitive data that would enable us to provide cost estimates for the oncondition actions specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC