JAL 747 Flew Seven Months With Improperly Attached Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Dec 23, 2005

JAL 747 Flew Seven Months With Improperly Attached Engines

Outboard Engines Swapped By Outsourced Maintenance Facility

Heads are likely rolling at Japan Airlines and Singapore's ST Aviation Services after the airline discovered one of its 747s has been flying for seven months with the left outboard and right outboard engines mistakenly swapped.

Airline officials admitted the error Wednesday, stating it occurred when ST Aviation Services performed an overhaul on the aircraft in February. The plane began flying passenger routes with the mis-attached engines in April.

The swap of the aircraft's two outboard engines never compromised the safety of the aircraft, said JAL authorities to Kyoto News.

While its true the engines operated just as they would normally under regular thrust conditions, the engines are not interchangeable with each other: the engines' thrust reversers were incorrectly positioned in the swap.

During reverse thrust braking procedures, each engine directed the thrust towards the fuselage of the aircraft, instead of away from it as intended -- causing little issue with braking performance, although it possibly added to the noise level in the cabin.

Also as a result of the mistake, components in one of the engines were not inspected at the scheduled 650 flight-hour interval -- instead flying over 850 hours before the switch was discovered during a November maintenance check.

According to Kyoto News, Japan's Land, Infrastructure and Transport Ministry directed the airline "to take measures to prevent any recurrence" of the engine swapping error. For its part, JAL will revise its in-house procedures to ensure that inspections on the planes are conducted after outsourced maintenance work.

The airline's current policy only calls for checking documents after the completion of maintenance work.

FMI: www.jal.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC