AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jan 01, 2022

AD: The Boeing Company Airplanes

AD 2021-24-02 Prompted By Reports Indicating Incidents Of Wires Chafing

The FAA is adopting a new airworthiness directive (AD) for all The Boeing Company Model MD-11 and MD-11F airplanes.

This AD was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. This AD requires, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective February 1, 2022.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all The Boeing Company Model MD-11 and MD-11F airplanes.

The NPRM published in the Federal Register on August 18, 2021 (86 FR 46167). The NPRM was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. In the NPRM, the FAA proposed to  require, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address wire chafing and arcing on the panel, which could cause damage to equipment, and result in loss of electrical power and a possible in-flight fire.

FMI: www.regulations.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC