Urgent (CASA) AD: Pacific Aerospace Corp. | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, May 08, 2004

Urgent (CASA) AD: Pacific Aerospace Corp.

AD/CRESCO/6 Fin Forward Attachment Fitting 7/2004 DM

Applicability: Model 08-600 series aircraft with aluminium fin forward attachment fitting part number 243017-2 installed.

Requirement: 1. Inspect in accordance with the Accomplishment Instructions of Pacific Aerospace Corporation Mandatory Service Bulletin (MSB) PACSB/CR/037. Additionally, inspect adjacent structure for corrosion or cracking and replace or repair as necessary. If the attachment fitting is found cracked or corroded, replace the fitting before further flight following inspection.
2. Replace aluminium attachment fitting part number 243017-2 with steel attachment fitting part number 243017-3 in accordance with the Accomplishment Instructions of MSB PACSB/CR/037.

Note: NZ CAA AD DCA/CRESCO/7 refers.

Compliance: 1. Within 50 hours time in service after 12 May 2004, and thereafter at intervals not to exceed 150 hours time in service; until accomplishment of Requirement 2 .
2. Upon the accumulation of 3,000 hours total time in service or within 150 hours
time in service after 12 May 2004, whichever occurs later. This Airworthiness Directive becomes effective on 12 May 2004.

Background: The manufacturer received a report of failure of an aluminium fin forward attachment fitting.

FMI: http://casa.gov.au/avreg/aircraft/ad/ADfiles/UNDER/CRESCO/CRESCO-006.pdf

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC