Final Assembly Underway For First French A400M | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Nov 28, 2011

Final Assembly Underway For First French A400M

Fuselage Delivered To Seville, Tail Sections Yet To Arrive

Following the launch of A400M series production last February, Airbus Military has begun final assembly of the first A400M that will be delivered to a customer - the French Air Force.

A400M Fuselage Delivery

The fuselage for this aircraft, known as MSN7, arrived at the final assembly line in Seville (Spain) on board an Airbus Beluga. The wings and nose arrived some days earlier and the integration of the central box and outer wings has already begun. The horizontal tailplane (HTP) is expected next week and the vertical tailplane (VTP) in two weeks time.

Airbus expects to deliver the first A400M to France in late 2012 or early 2013. Eight serial A400M aircraft are already at different stages of production.

In September, a test aircraft designated Grizzly 1 successfully performed the high-energy rejected take-off test which confirms the capability of the braking system to stop the aircraft safely following a rejected take-off at high speed and high weight. Emergency evacuation tests were also carried out to demonstrate that the aircraft can be safely evacuated in a specified time when loaded with troops or other passengers in various configurations.

Delivery of A400M Wing Sections

The high-energy rejected take-off test is one of the toughest in the program and, because of the risk of damage to the aircraft, is among the last items performed before preparation of the aircraft flight manual. It required the aircraft, loaded to the maximum take-off weight, to make a simulated take-off run which was aborted at the V1 decision speed.
 
As specified by the testing authorities the aircraft was then taxied clear of the runway and stopped for five minutes before firefighters were allowed to cool the brakes and wheels. As is typical in this test, three of the aircraft´s tyres deflated. There was no further damage and the test was highly successful.
 
The emergency evacuation tests were performed over several days at the A400M Final Assembly Line in Seville using the fifth development aircraft which is mostly complete and due to fly before the end of the year. All the tests required for certification were passed. They were performed with, respectively, paratroopers, conventional troops, in a medical evacuation configuration, and in a mixed configuration of troops and cargo.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC