NASA's Space Launch System One Step Closer To 2017 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, May 25, 2014

NASA's Space Launch System One Step Closer To 2017 Flight

Test Demonstrates Key Structure's Max Load

NASA and ATK are one step closer to meeting a 2017 launch date for NASA's Space Launch System (SLS) after completion of a significant structural test of the booster's main attachment mechanism. NASA is developing SLS to take humans farther into deep space than ever before.

"We test like we fly," said Charlie Precourt, vice president and general manager of ATK's Space Launch Division, and former four-time space shuttle astronaut. "There are no second chances in spaceflight—we have to be certain we've got it right before we launch."

The article tested was a major load-bearing structure known as the forward skirt. The attach point on the forward skirt is where the main stage attaches to the five-segment solid rocket boosters that will launch SLS into deep space. ATK is providing the boosters as well as integration with the forward skirt.

The forward skirt is one of many critical components of the SLS booster design and must be tested to meet very demanding SLS requirements. For the test, ATK designed and fabricated a new test stand capable of applying millions of pounds of force to the structure.

Technicians tested the forward skirt at simulated lift-off and ascent conditions before testing it to failure. The final test demonstrated the structure's maximum load.

NASA's SLS booster program remains on track for a late 2017 launch. The booster critical design review will be held this summer.

(Image provided by ATK)

FMI: www.nasa.gov, www.atk.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC