AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Apr 03, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-06-04

PRODUCT: Certain Airbus Model A320-111, -211, -212, and -231 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2004-03-07, which applied to the aircraft listed above AD 2004-03-07 required repetitive inspections for fatigue cracking around the fasteners attaching the pressure panel to the flexible bracket at a certain frame (FR), adjacent to the longitudinal beams on the left and right sides of the airplane; and repair as necessary.

This new AD retains certain requirements of AD 2004-03-07, expands the applicability, and requires an inspection of the fastener holes on the pressure panel and modification or repair as applicable.

This AD was prompted by fatigue tests which revealed cracking around the fasteners attaching the pressure panel to the flexible bracket, and by the discovery of additional cracks under the longitudinal beams at locations that are not included in the inspection area required by AD 2004-03-07.

DATES: This AD is effective May 3, 2018.

COST: The FAA estimates that this AD affects 737 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspection [Retained from AD 2004-03-07]: Up to 2 work-hours × $85 per hour = $170 per inspection cycle.
  • Inspection [new proposed requirement]: 13 work-hours × $85 per hour = $1,105.
  • Modification (if necessary): Up to 213 work-hours × $85 per hour = $18,105 Parts are estimated to cost up to $8,510, for a total cost per airplane at up to $26,615.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC