FAA Reopens Comment Period On Proposed Twin Cessna ADs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Oct 04, 2003

FAA Reopens Comment Period On Proposed Twin Cessna ADs

$70,00 Per Aircraft Based On Theory?

The FAA has reopened the comment period for two contentious and potentially very costly proposed ADs. Together, they affect more than a thousand Cessna 401, 402, and 411 model aircraft. They mandate inspection of wingspar caps for fatigue cracks and installation of a Cessna-manufactured spar strap modification kit. Estimates of the cost to comply with the ADs run as high as $70,000 per aircraft. Yikes.

The AOPA and the Cessna Pilots Association oppose the proposed ADs because they are not based on "real-world" reports. The proposed ADs are based entirely on theoretical data from a federally funded engineering analysis done by Cessna. To date, there has not been a history of trouble reports from the field to support the theory.

If the AD were to be issued, both AOPA and CPA say the compliance methods are just too complex to be completed in the field. Aviation maintenance experts say there may be only three maintenance facilities in the country capable of performing the necessary work on the twin Cessnas.

"It's likely to take several years to comply with the provisions of the proposed ADs," said AOPA Director of Regulatory and Certification Affairs Luis Gutierrez. "The resulting aircraft downtime would be devastating to owners and operators of affected aircraft."

FMI: www.aopa.org/whatsnew/regulatory/regtwincessna2.html

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC