Spirit Aeronautics Offering ADS-B Position Guarantees | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jun 02, 2016

Spirit Aeronautics Offering ADS-B Position Guarantees

Reserves Equipment Necessary And Secures An Installation Position

Beginning July 1, Spirit Aeronautics customers will be able to lock-in their ADS-B upgrade and ensure the required equipment is reserved for their aircraft.

“With less than 1309 days until the ADS-B mandate becomes a reality, customers need to reserve their equipment and installation position as quickly as possible to ensure they can meet the deadline”, said Tony Bailey, Spirit Aeronautics President and COO.

“To make it easier and cost effective for our customers, we have established the ADS-B Position Guarantee Program which essentially reserves the equipment required for the upgrades and secures a position on the schedule. This is just another innovative way we use to help our customers meet the requirements and mitigate the risks of being left holding the bag on January 1st, 2020.”

The Spirit Aeronautics ADS-B Position Guarantee Program allows customers to reserve the equipment and schedule position required to complete an ADS-B upgrade to their aircraft. There is also an option to lock in costs (where available) and capitalize the event by making payments towards the event which will be secured in escrow. This allows customers to realize cost savings, capitalize the costs and meet the requirements on their terms instead of being captured by market trends.

(Source: Spirit Aeronautics news release)

FMI: www.spiritaeronautics.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC